Amazon Price Tracking and History for:
Cary 10pcs Yellow Long Lead Axial Polyester Film Capacitor 0.01uf 630v Fr Tube Amps - (B00LLFYJO6)

  • Amazon.com
    Not in Stock
    as of 2025-02-26 14:00:33 UTC

See all offers on
Max (LNP):   6.19 USD     Scan Date:   2018-03-21 00:55:13 (UTC)
Min (LNP):   6.19 USD     Scan Date:   2018-03-21 00:55:13 (UTC)
Average (LNP):   6.19 USD     Total Price Points:   23
Start Date:   2018-03-21 00:55:13 (UTC)  Code:   B00LLFYJO6
End Date:   2025-02-26 14:00:33 (UTC)  Status:   Available
Previous (LNP):   - USD   Price Drop:   -
Previous (LP):   - USD   Price Drop:   -

Top drops for the price of this product on Amazon.

We do not have any information to present at the moment. Sorry for any inconvenience.

(*) Zero price values on the history chart indicate an out of stock or unavailable status.

Currently, no list price but you still can start tracking and your selected ratio will be used.


Minimum price drop (As sold by Amazon)

You will be notified if the price list drops below: $



Information:
The list price (LP) of this product as offered by Amazon itself as a seller.
Use the slider above to select the minimum price value for email alerts.
You can stop the tracking by entering the same email and clicking stop tracking.

Currently, no 3rd party new price but you still can start tracking and your selected ratio will be used.


Minimum price drop (3rd Party - New)

You will be notified if the 3rd party price list drops below: $



Information:
3rd Party New: Lowest new price (LNP) offered by a third-party seller (Or Amazon) without including shipping price.
Use the slider above to select the minimum price value for email alerts.
You can stop the tracking anytime by entering the same email and pressing stop tracking.

Currently, no 3rd party used price but you still can start tracking and your selected ratio will be used.


Minimum price drop (3rd Party - Used)

You will be notified if the 3rd party (used) price list drops below: $



Information:
3rd Party Used: Lowest used price (LUP) offered by a third-party seller (Or Amazon) without including the shipping price.
Use the slider above to select the minimum price value for email alerts.
You can stop the tracking anytime by entering the same email and pressing stop tracking.



View History For